Small Scale Track - Tyler - October 3

This week the Small Scale Track (SST) team met with small scale controls and small scale bogey to further our plans.  We split off into our respective sub groups and SST decided to add support brackets to each turn section of the track.  Most of the binding and failure happens here and we found that holding a bracket in this location fixed a lot of our issues. One concern we had with this bracket is the play that the wheels have in them during the turns.  To deal with this issue, the curved supports will be widened by 0.5".  The 3D modeling of this part has started.


 We discussed the option of meeting with one of our sponsors to get injection molding done and decided that if we were to go with injection molding that the track brackets were the best thing to get injection molded because they are the most mass produced item in our design and only one mold would be needed.


Comments

Popular posts from this blog

Small Scale Track - Tyler - April 24

This week we spent some time grinding the last of the welds and started assembling the track bender.  We had several design challenges and some fit and finish issues, but ultimately succeeded in finishing the new track bender.  The process of bending the rails is not as smooth as we had hoped but we do obtain successful bends.  One of the challenges is that the caster wheels we are using are not strong enough to resist the force of the bottle jack pressing against them.  These will eventually need to be replaced, but they should do fine for this semester.

Small Scale Track - Tyler - April 17

During this week, presentations continued and groups finalized their designs.  Many groups are running into manufacturing issues with the makers space water jet cutter being down.  They discussed potential improvisations and how they will proceed.  For small scale, we had a monumentous accomplishment of completely finishing all of the welding required and we can now focus on assembling the track bender.

Small Scale Track - Tyler - April 10

This week was the start of the 2nd presentation.  The presentations had to be cut short because of the move of the guide way from campus to the 115 Terraine St location.  The remainder of the class was spent purchasing our final materials and setting up reimbursements with Tinan.  We believe we have everything we need ordered.  Also, I found a family friend that can provide access to basic welding equipment!  Hopefully it will be enough for us to complete what we need to.